阿尔卑斯水车锯木厂与落锤铁匠铺
AshutoshShrivastava @ai_for_success · 2026-11-15 · 1.9万 播放 · ♥ 396
Gemini 4 Carbon
作者使用 Goal、Swarm、Gemini 4 Carbon 和自定义技能,制作了一个带联动水力机械的阿尔卑斯水车锯木厂与铁匠锻造炉 3D 体验。
完整提示词
Build an interactive 3D web experience of an Alpine Waterwheel Sawmill & Blacksmith Trip-Hammer Forge set in a sunlit mountain gorge. The scene and experience should include: 1. Setting & structures: A weathered stone-and-timber watermill with an adjoining open-bay blacksmith forge beside a rocky mountain stream and flume, framed by gorge rock faces, a small stone footbridge, pine trees, stacked timber logs, mossy boulders, a coal hearth, quench barrel, and workbench tools. 2. Coupled water-to-machine mechanics: - An interactive sluice gate control (0% to 100% flow) that regulates water pouring down the wooden flume onto an overshot waterwheel. - Water flow physically drives the wheel speed, which in turn drives the interior shaft and gear train powering: - A reciprocating frame-saw cutting a timber log on a moving carriage. - Pumping forge bellows that brighten the hearth coals as airflow increases. - A cam-driven trip-hammer striking a glowing hot iron billet on the anvil with impact sparks when the hammer drops. - Closing the sluice gate smoothly coasts the wheel, gears, saw, bellows, and hammer to a stop. 3. Inspection & controls: - A cutaway / open-mill toggle that opens the roof and wall shutters so the entire interior gear train, linkages, saw, bellows, and trip-hammer can be inspected clearly in motion, with nothing hidden inside empty shells. - Smooth orbit/zoom camera controls plus quick camera presets (wide gorge establishing view, sluice & waterwheel, sawmill mechanism interior, and forge trip-hammer & anvil close-up). Important guidance Original imaginary scene: This is a fictional world, not a real-world landmark. Strict 1:1 matching of incidental 2D concept details or ornament counts is not required. Do not waste time nitpicking minor sketch variations. Prioritize convincing 3D craft, crisp close-up materials and lighting, clean focus, and rock-solid working mechanics. Plan first, wait for go-ahead: Do not start building yet. do your upfront inspection and planning, present the complete plan, and wait for my explicit go-ahead. Once approved, I will let you run unattended.
出处:作者本人的回复,原文照录。
GoalSwarmAntigravity
去 X 看原帖 ↗模型和版本以作者自述为准。作品版权归原作者,要更正署名或下架请私信 @GoSailGlobal。